Electricity: EKEDC Engineers Working At Various Locations In Lekki Area

AD


The Eko Electricity Distribution Company (EKEDP) Engineers are working at various locations in the Lekki area.
1. Repair of cut upriser jumper on Fatai Idowu Arobieke 1X500KVA, Basorun Okusanya 11 KV feeder.
2. Repair of cut neutral main line jumper on Akeem Dickson 1X500KVA, Water Corporation 11KV Feeder Lekki.
3. Repair of loosed neutral service wire at plot 6 Theophilius Oji str on Victoria Arobieke 11KV feeder, Lekki.
4. Replacement of ruptured feeder pillar fuses on Seventh Day Adventist 1x500KVA, Water Corporation feeder Lekki Phase 1.
5. Replacement of feeder pillar fuses on Furo Ezimora 1×500 KVA, Water Corporation feeder Lekki Phase1.
6. Replacement of ruptured Feeder pillar Fuses on Chair Center 1X500KVA, Water Corporation feeder.
7. Repair of upriser jumper cut on Itedo 2X500KVA, Jubril 11KV feeder, Lekki.

8. Repair of cut LT main line on Oyinbo Adjaro 1X500KVA, Jubril Ayinla 11KV Feeder.

Credit: EKEDP

 Please bear with EKEDP as we strive to serve you better.
Thank you.

EKEDP

AD

Be the first to comment

Leave a Reply