Power Generation from 22-12-2016 to 21-01-2017

National Grid System Performance (20-01-2017)

The National grid system performance as recorded by Nigeria Electricity System Operator for the 20th of January, 2017 is given as;

Highest Frequency: 51.32 Hz

Lowest Frequency: 48.52 Hz

Peak Generation: 2,662.20 MW

Lowest Generation: 2,662.20 MW

This accounts for only 23% of the estimated 12,000 megawatts (MW) required for Nigerians to enjoy steady power supply.

 