National Power Grid Performance (01-02-2017)

The national grid performance for the 1st of February 2017, as recorded by the Nigeria Electricity System Operator:

 

Highest Frequency: 51.47 Hz

Lowest Frequency: 47.52 Hz

Peak Generation: 3,597.70 MW

Lowest Generation: 143.00 MW

This only amounts to 29.97% of the estimated 12,000 MW necessary for steady power supply across the nation.

Get the latest, best and exclusive power sector content first.

Tomide Adeyeye

Federal University Of Technology (FUTA) Alumnus. I am constantly overwhelmed by the power of the written word and how it can transcend genres, stereotypes, and even time itself. This fascination drives my passion for writing.

Leave a Reply