National Power Grid Performance (01-02-2017)

AD

The national grid performance for the 1st of February 2017, as recorded by the Nigeria Electricity System Operator:

 

Highest Frequency: 51.47 Hz

Lowest Frequency: 47.52 Hz

Peak Generation: 3,597.70 MW

Lowest Generation: 143.00 MW

This only amounts to 29.97% of the estimated 12,000 MW necessary for steady power supply across the nation.

Get the latest, best and exclusive power sector content first.

AD

About Tomide Adeyeye 429 Articles
Federal University Of Technology (FUTA) Alumnus. I am constantly overwhelmed by the power of the written word and how it can transcend genres, stereotypes, and even time itself. This fascination drives my passion for writing.

Be the first to comment

Leave a Reply